Usine COCA COLA Posted by getb on 2 January 2020 Master of work : Mr BERRADA NAJIB ARCHISCENES in Casablanca Project : Construction of a COCACOLA + DATA CENTRE plant in Tangier Surface area (m2) : 45.000 m2 Covered Year of Achievement : 2017
WAFA ASSURANCE Posted by getb on 2 January 2020 Master of work : Mrs DRISSI QEYTOUNI and Mr GESSOUS in Casablanca Project : CONSTRUCTION OF THE SEAT WAFA INSURANCE Surface area (m2) : 9.500 m2 Year of Achievement : 2001
SGMB ABDELMOUMEN Posted by getb on 2 January 2020 Master of work : Mr TAZI RACHID in Casablanca Project : Modification and Extension of the Headquarters of SGMB (TRANCHE A), located at Bd Abdelmoumen in Casablanca Surface area (m2) : 7.500 m2 Covered Year of Achievement : 2017
RIU TIKIDA BEACH Posted by getb on 2 January 2020 Master of work : Mr KHARIM AHMED in Agadir Project : Renovation of the Hotel “TIKIDA BEACH” in Agadir Surface area (m2) : 35.000 m2 Year of Achievement : 2015
Polyclinique TARGA Posted by getb on 2 January 2020 Master of work : Mr EL GUERNAOUI MOHAMED in Marrakech Project : Construction of a TARGA Polyclinic in Marrakech Surface area (m2) : 13.000 m2 Year of Achievement : 2015
MARJANE IBN TACHFINE Posted by getb on 2 January 2020 Master of work : Mr LAZRAK AZIZ and ARCHI DESIGN in Casablanca Project : Construction of the MARJANE IBN TACHFINE in Casablanca Surface area (m2) : 54.000 m2 Year of Achievement : 2016
Mail Central Khouribga Posted by getb on 2 January 2020 Master of work :Mr BENKIRANE SAD in Rabat Project : Realization of an Office Complex MAIL CENTRAL in Khouribga Surface area (m2) : 34.400 m2 Year of Achievement : 2013/2015
La RENAISSANCE Posted by getb on 2 January 2020 Master of work : Mr BENJELLOUN HAKIM in Casablanca Project : Rehabilitation of the hotel LA RENAISSANCE in Marrakech Surface area (m2) : 7.800 m2 Year of Achievement : 2009
KASR AL BAHR Posted by getb on 2 January 2020 Master of work : ATLANTIC COAST HOSPITALITY Project : KARIM CHAKOR CABINET in Rabat Surface area (m2) : Approximate Covered Area: 74.805 m2 Year of Achievement : En Cours
INWI Posted by getb on 2 January 2020 Master of work : without Project : Project DATA CENTER Nouaceur 1er Evolution Surface area (m2) : 1.050 m2 Year of Achievement : 2017